all documents
  • all documents
  • within the 130 documents
Advanced search
Search set :
all documents
  • all documents
  • within the 130 documents
Search by geolocation
Enter a landmark, address, city, country... :
Distance :  close
Search set :
all documents
  • all documents
  • within the 130 documents
Search by color
Search set :
all documents
  • all documents
  • within the 130 documents
Refine search
No keyword found to refine search
Keywords
Localization
130 documents found
1 3
Documents per page :
  • Assembly of the A320neo nacelle
  • Assembly of the A320neo nacelle
  • Machining and drilling
  • lay-up
  • Tack welding of tube for LEAP 1A
  • Preparation for the brazing step
  • Preparation for the brazing step
  • Tube deburring after cutting
  • Tack welding of tube for LEAP 1A
  • Quality inspection of cables for Rafales
  • Manufacturing test
  • Quality inspection of cables for Rafales
  • MRO: Uliss platform assembly and cabling
  • MRO: Uliss platform assembly and cabling
  • Bench for filling laser gyro
  • Bench for filling laser gyro
  • Test d'un transposeur de fréquence en bande Ka de la famille STREAM
  • Telemetry equipment test: frame for RTR chassis
  • Illustration for LinkedIn cover
  • Industrial Department - Okuma machine
  • Pyrolysis degreasing
    Distributer
  • Support Services Marketing Safran Helicopter Engines Academy
  • Support Services Marketing Safran Helicopter Engines Academy
  • Assembly of a source for an antenna
  • Assembly of a source for an antenna
  • Assembly of a source for an antenna
  • CMS screen printing & CMS assembly
  • Technological expertise laboratory: sample cutting and polishing
  • Technological expertise laboratory: sample cutting and polishing
  • Binocular CMS visual inspection
  • Flight recorder with magnetic tape
  • CORTEX integration platform / electronic board testing
  • Motor and fan wheel sub-assembly for the A350 program
  • Oil cooling system by ventilation for the rotor of various Helicopter programs.
  • Rotor
  • Wiring on the base structure 285
  • Desinstallation : Employee cutting wires
    BEST Cabin modification site - Boeing 777 COI
  • Operations control
    BEST Cabin modification site - Boeing 777 COI
  • Uninstallation: cutting wires
    BEST Cabin modification site - Boeing 777 COI
  • Wiring operations
    BEST Cabin modification site - Boeing 777 COI
  • Wiring operations
    BEST Cabin modification site - Boeing 777 COI
  • Work on screen (preparation)
    BEST Cabin modification site - Boeing 777 COI
  • Vest testing
  • Assembly of a missile autodirector
  • Rigging and packing of an EPC*
  • Interconnect shop and engineering maintenance of harness
  • Assembly of vaccum toilet
  • Harness Final Inspection at Safran facility in Hyderabad, India
  • Harness Inspection on the Rafale Production line at Safran facility in Hyderabad, India
  • Leap Production Line at Safran facility in Hyderabad, India
  • Leap Production Line at Safran facility in Hyderabad, India
  • Warehouse area at Safran facility in Hyderabad, India
  • Expertise laboratory : Fuel et oil filters
  • Expertise laboratory Fuel et oil filters
  • Passage to the oven
  • Bench and collimator for Euroflir 410 NG core integration
  • Textile arresting systems : coiling of tearing straps
  • Military Products, Lifejackets Workshops
  • Interconnection solutions
  • Interconnection solutions
  • Next page
Selection
See selection
Drop here to remove from your selection